How It Works

Five steps to secure a tarp on any roof - no roof penetrations.

Installation Steps

1

Determine the Materials Needed

Measure the damaged area to determine the tarp size, then gather what you need: a heavy duty polyethylene tarp, furring strips for the perimeter, enough TarpBags for the perimeter, screws, and a standard garden hose.

2

Position Your Tarp and Roll Furring Strips

Lay a heavy duty polyethylene tarp over the damaged area. Place furring strips along the perimeter and roll the tarp edge tightly around the strips to create a secure anchor edge.

3

Secure TarpBags to the Furring Strips

Position empty TarpBags along the rolled edges and fasten them to the furring strips using screws. Fasteners go into the wood strips only, not the roof.

4

Fill with Water

Connect a standard garden hose and fill each TarpBag on site. Each bag fills in a few minutes and provides controlled weight distribution.

5

Secure the Perimeter

Continue placing filled TarpBags along the perimeter to fully secure the tarp without roof penetration.

Frequently Asked Questions